Civil work for Oxygen Plant, Installation of 630 KVA-transformer completed at GMC Doda

Doda May 06: In view of the rising demand for oxygen in patients amid COVID-19 surge and to provide uninterrupted power supply in the region, District Administration Doda conducted the work for the Oxygen plant and installation of 630 KVA transformer at Government Medical College Doda.



Taking to Twitter, Dr Jitendra Singh shared the information about the completion of both the works.